100T Double Beam Bridge Crane

Share this:
Get in Touch
  • Industry: Transportation Industry
  • Lifting equipment: Rotating lifting beam
  • Capacity: 100T
Location: Pakistan
01
,
2024

The Lahore Orange Line rail Transit project is an early harvest and demonstration project of the China-Pakistan economic Corridor. The successful implementation and operation of the project will be of great significance to both China and Pakistan. It is a large-scale rail transit project launched under the framework of the Belt and Road Initiative and the China-Pakistan Economic Corridor. The full length of the orange Line project is about 25.58 kilometers, with 26 stations, including 24 elevated stations and 2 underground stations. We provided 32 sets of lifting equipment of various types for the vehicle depot and parking lot of the project for vehicle maintenance and debugging.

Related Industries

Send us a message